Reviewed by Sewer & Water Pros Editorial Team
Licensed NYC Sewer & Water Main Contractors — 20+ Years Experience
Understanding how combined sewer overflows work in NYC and what they mean for your property.
Approximately 60% of NYC is served by combined sewers that carry both sewage and stormwater in a single pipe. During dry weather, all flow goes to wastewater treatment plants. But during heavy rain, the combined volume can exceed the system capacity, causing combined sewer overflows (CSOs) that discharge a mix of stormwater and untreated sewage into local waterways. NYC has 460 CSO outfalls across the five boroughs. The city is investing billions in infrastructure upgrades, green infrastructure, and storage tanks to reduce CSO events. Property owners can help by reducing stormwater runoff from their properties.
Key Takeaways
- •Always hire a licensed NYC master plumber for sewer and water main work
- •NYC DEP permits are required for all sewer and water main projects
- •Get multiple estimates and verify contractor credentials before hiring
- •Emergency services are available 24/7 — don't wait if you have a backup or break
Need Professional Help?
Call Sewer & Water Pros for expert service across all five NYC boroughs.
Call (917) 447-7377Written & Reviewed by Sewer & Water Pros Editorial Team
Licensed NYC Sewer & Water Main Contractors
Our content is written and reviewed by licensed NYC master plumbers who specialize exclusively in sewer line replacement and water main replacement. With over 20 years and 5,000+ sewer and water main jobs completed across all five boroughs, we know NYC's underground pipe infrastructure inside and out. Every article is fact-checked against current NYC DEP regulations.
Related Articles
How Much Does Sewer Replacement Cost in NYC?
8 min read
Cost GuidesHow Much Does Water Main Replacement Cost in NYC?
7 min read
Guides10 Signs You Need Sewer Line Replacement
6 min read
Guides8 Signs You Need Water Main Replacement
5 min read
PermitsNYC DEP Sewer Permits: Complete Guide
10 min read
PermitsNYC DEP Water Main Permits: Complete Guide
9 min read